Spanish: The municipal potable water RO plant is on the west coast of Florida and has a design capacity of 20 MGD. It receives water from brackish wells supplied by the Hawthorne Aquifer. There are a total of 10 trains. Four trains have Dow Filmtec BW30-400 membranes with a (40X6)→(20X6) configuration running at 75% recovery. The other 6 trains have Toray TM720-400 membranes with a (42X6)→(18X6) configuration running at 75% recovery.
Visit our Conference Papers